Surveyor 3 landing
Surveyor 3 · 1967 CE – 1969 CE · The Moon
Land in the Apollo zone east of Surveyor 1, photograph the surface, measure its bearing strength and work a surface sampler from Earth.
Historical context
NASA's Surveyor landers were to prove the technique of a soft landing and check the Apollo design against the lunar surface. Surveyor 3, the second to land, touched down three times because its engines would not stop, dug four trenches with a scoop worked from Earth and, thirty-one months later, was visited by the Apollo 12 crew, who brought its camera home.
The voyage, step by step
A hydrogen rocket to the Moon
17 April 1967
At 07:05 UTC on 17 April 1967, 02:05 Eastern Standard Time, an Atlas-Centaur lifts the third Surveyor off Complex 36B at Cape Kennedy; its Centaur stage fires twice, with a coast in Earth orbit between.
A landing in three touches
20 April 1967
At 00:04 UTC on 20 April 1967, 19:04 Eastern Standard Time on 19 April, Surveyor 3 touches the Moon with its engines still firing and bounces twice before a command from Earth shuts them off.
Landing in the Ocean of Storms
20 April 1967
Surveyor 3 comes to rest tilted about 14 degrees on the inner slope of a crater some two hundred metres across; its first picture is taken within the hour, and by 3 May it has taken more than six thousand.
Four trenches in the dust
22 April 1967
From 22 April, controllers on Earth work a scoop on a hinged arm that opens out like a pair of scissors, pressing, digging and dropping the soil in view of the camera.
Visited by Apollo 12
19 November 1969
At 06:54 UTC on 19 November 1969, 00:54 Houston time, Pete Conrad and Alan Bean set the lunar module Intrepid down on the rim of Surveyor Crater, 155 metres from the old lander.
The camera comes home
20 November 1969
On 20 November, during their second moonwalk, Conrad and Bean reach Surveyor 3 at 06:27 UTC, find it turned brown, and cut off its television camera, its scoop, two lengths of tubing and a piece of cable to take home.
Outcome
Landed in the Ocean of Storms on 20 April 1967 after three touchdowns, took more than six thousand pictures and dug four trenches; on 19 November 1969 Apollo 12 landed 155 metres away, and Conrad and Bean brought its camera and scoop home.
Surveyor 3
NASA lander that touched down on the Moon in 1967 and was later visited by the Apollo 12 crew.
Sources
- Surveyor 3 — NSSDCA Master CatalogNASA Space Science Data Coordinated Archive
- Surveyor III: A Preliminary Report (NASA SP-146)Surveyor Program, NASA Office of Space Science and Applications · NASA · 1967
- Surveyor III Mission Report, Part I: Mission Description and Performance (JPL Technical Report 32-1177)Jet Propulsion Laboratory · Jet Propulsion Laboratory, California Institute of Technology · 1967
- Taming Liquid Hydrogen: The Centaur Upper Stage Rocket, 1958–2002 (NASA SP-2004-4230)Virginia P. Dawson and Mark D. Bowles · NASA History Office · 2004
- Beyond Earth: A Chronicle of Deep Space Exploration, 1958–2016 (NASA SP-2018-4041)Asif A. Siddiqi · NASA History Division · 2018
- Analysis of Surveyor 3 Material and Photographs Returned by Apollo 12 (NASA SP-284)NASA (N. L. Nickle, W. F. Carroll and others) · NASA Scientific and Technical Information Office · 1972
- Apollo 12 Lunar Surface Journal: A Visit with the Snowman (mission summary)Eric M. Jones and Ken Glover · Apollo Lunar Surface Journal · 1995
- Apollo 12 Lunar Surface Journal: A Visit to the Snowman (landing)Eric M. Jones and Ken Glover · Apollo Lunar Surface Journal · 1995
- Apollo 12 Lunar Surface Journal: Surveyor Crater and Surveyor IIIEric M. Jones and Ken Glover · Apollo Lunar Surface Journal · 1995
- A Microbe on the Moon? Surveyor III and Lessons Learned for Future Sample Return Missions (abstract 5023)John D. Rummel, Judith H. Allton and Don Morrison · Lunar and Planetary Institute, Solar System Sample Return Missions workshop · 2011
- A Microbe on the Moon? Surveyor III and Lessons Learned for Future Sample Return Missions (presentation)John D. Rummel, Judith H. Allton and Don Morrison · NASA Science · 2011
- Surveyor Crater, Before and AfterRyan Watkins · Lunar Reconnaissance Orbiter Camera team, Arizona State University · 2013
- First Look: Apollo 12 and Surveyor 3Mark Robinson · Lunar Reconnaissance Orbiter Camera team, Arizona State University · 2009
- Apollo 12 Lunar Module / ALSEP — NSSDCA Master CatalogNASA Space Science Data Coordinated Archive
- Surveyor 3 — Wikipedia
Continue exploring
- Apollo 8 lunar orbitApollo 8 · 1968 CE
- Luna 9 landingLuna 9 · 1966 CE
- Apollo 11Neil Armstrong · 1969 CE
- Luna 16 sample returnLuna 16 · 1970 CE